Web Content Viewer
Actions
Engineer Certification for Fabricated Structures (ECERT-FS)

Upon completion of construction associated with a Permit to Install (PTI), the ECERT-FS Form must be completed by a Professional Engineer registered in the State of Ohio to certify that construction of certain fabricated manure storage structures was completed in accordance with the approved plans and specifications. The completed ECERT-FS Form is required before the fabricated structure can be put into service. In addition the ECERT-FS Form may be required before animals can be stocked at the facility.